todas as categorias
enEN
Guindastes para Sala de Operações

Casa / Produtos / Sala de cirurgia e UTI / Guindastes para Sala de Operações

G01 Ponte suspensa de separação seca e molhada
G01 Ponte suspensa de separação seca e molhada

G01 Ponte suspensa de separação seca e molhada

Folheto do produto:DOWNLOAD

  • Introdução
Introdução

1.Operating power: AC220V, 50HZ;

2.Beam length: 2800~3000mm (subject to user’s measurement at site); Lighting lamp: 1;

3.Optional braking device, the equipment does not drift and can move easily when the device is released;

4.Hanger type dry section pendant: 1 (left and right moving distance: 500mm). The configuration is as follows:

(1)Instrument deck: 3 layers (height adjustable), 550×400*30mm optional; use 10mm×25mm side rail of international standards for protection with rounded-corner collision avoidance design;

(2)Standard configuration of gas terminal: (2 for oxygen, 2 for suction, 2 for air) may be per the hospital’s requirements

a.Different interface colors and shapes, with faulty connection prevention function;

b.Plugging and unplugging times: over 20,000;

c.Adopting secondary seal with three states (on, off and remove), which can be maintained with gas;

(3)Multifunctional power sockets: 8, 220V

(4)Grounding terminals: 2;

(5)Network interface: RJ45, 1; telephone interface: 1

(6)Lighting lamp: 1;

(7)Drawer: 1;

(8)Stainless steel adjustable infusion rod holder: 1;

(9)Stainless steel adjustable injection pump rack:1;

(10)Rotation angle: 0~340°;

(11)Net load weight of dry section pendant: ≥80kg;

(12)All gas terminals, power interfaces and weak current interfaces are placed on the terminal box, electricity and gas are separated and the power supply and gas source are installed on the aluminum column of the pendant body, respectively.

5.Column type wet section pendant: 1 (left and right moving distance: 500mm). The configuration is as follows:

(1)Standard configuration of gas terminal: (2 for oxygen, 2 for suction, 2 for air) may be as per hospital’s requirements

a. having faulty connection prevention function;

b. tempos de conexão e desconexão: mais de 20,000;

c. adotando selo secundário com três estados (ligado, desligado e removido), que pode ser mantido com gás

(2)Multifunctional power sockets: 8, 220V;

(3)Grounding terminals: 2;

(4)Stainless steel adjustable infusion rod holder: 1;

(5)Stainless steel adjustable injection pump rack:1;

(6) Storage basket: 1;

(7)Rotation angle: 0~340°;

(8)Power interfaces placed on both sides of the pendant, gas source distributed on the back side of the pendant, thus fully realizing separation between electricity and gas and ensuring the safety of equipment use.

6. O material principal é perfil de liga de alumínio de alta resistência;

7.Surface is finished by electrostatic spraying.

PRODUTO RELACIONADO

Tem perguntas sobre Arshine Lifescience?

Nossa equipe de vendas profissional está esperando por sua consulta.

SAIBA MAIS